| 1.Knitting Condition |
| |
1.1 Draft : |
Below 3.3 required / below 3.0 recommended |
| |
1.2 Yarn Guid : |
Design all yarn guid position to give minimun resistance to spandex.Constant maintenance is required |
| |
1.3 Kniting Speed : |
Should avoid the condition that spandex chees jukps on the feeding device. |
| 2.Scouring Agent |
| |
|
Do not use catonic agent to prevent oxidation.Anionic or amphoteric agent is recommended. |
| 3.Pre-set |
| |
|
Below 190 C is required we recommend 180 - 185 x 50 - 60 seconds. |
| 4.Bleaching |
| |
|
Do not use chlorine bleaching agent to prevent yellowing and embrittlement.We recommend Hydrogen peroxide or hydrosuifide. |
| 5.Dyeing |
| |
5.1 |
Below 100 C x 60 min.is required.We recommend 100 C x 30 min. |
| |
5.2 |
In case of using with polyester,dyeing temperature and time should be as low as possible.Re-dyeing is prohibitted. |
| 6.caution |
| |
|
As this instruction is general one,we can not assure all kind of condition by this instruction.Therefore in case of using new type of NRR Spandex ,it is essential to make a preliminary test before main products. |